SP Industries Introduces CP-1501: High Density, Single Cylinder Stationary Commercial Compactor Serviceable by Front/Rear Load Trucks


SP Industries offers the CP-1501 commercial compactor. With a single cylinder design, this compactor easily handles dry waste and packaging materials. By packing into a front or rear load container, this machine is serviceable by the haulers standard front/rear load route, which eliminates downtime and the need for a second container. The CP-1501 helps lower costs by creating high density, reduced volume material, which requires less space and fewer trips to the landfill or recycling center. Compaction also keeps materials safely undercover and out of sight, preventing waste from becoming windblown debris or a source of pollution. The CP-1501 is ideal for business offices, retail outlets, hotels and universities.

CP-1501 highlights include:

  • Serviceable by Front/Rear Load Trucks

  • Large, clear top opening of 45.6” x 46”

  • Capacity: 1-1/2 cubic yards

  • Volume displacement: 90 cubic yards/hour

  • Cycle time: 50 seconds

  • 39,500 lbs. maximum force

  • Numerous specialty optional equipment and design features

All SP compactors meet/exceed ANSI and OSHA specifications for safety, and are backed by the company’s best-in-industry warranty program. American supplied electrical and hydraulic components are specified for reliability and easy nationwide serviceability.

For more information, visit: bestcompactors.com, email: info@sp-industries.com, or call: 269.793.3232.



May 5, 2017



Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.