Simplex ES Net IP-Based Life Safety Network Adds Speed and Resilience to Fire Detection and Life Safety Systems


Johnson Controls’ new Simplex life safety network greatly increases the speed and ease at which fire detection and life safety systems communicate and operate. The Simplex ES Net Life Safety Network harnesses the power of IP technology with data rates up to 100MB per second and a range of network connection choices including Ethernet, DSL and fiber. It gives building owners reassurance knowing as the IP standard evolves, so will ES Net, making the life safety system resilient and future-proof.

Simplex ES Net also provides greater flexibility during network expansion. By allowing up to 82,000 feet (25 Km) between units, ES Net gives users more options to meet performance and budget requirements. The network’s increased memory capacity and broad bandwidth helps improve uptime, ensure more consistent performance and support future expansion and enhancements.

“Johnson Controls has brought leading edge innovation to fire detection and life safety systems,” said Anil Konjalwar, senior product manager, Fire Detection, Johnson Controls. “The new Simplex ES Net offers a powerful solution for customers seeking a fast, reliable and efficient life safety network.”

With the system’s TrueSite Workstation Mobile Client, network monitoring and management can easily be completed on a mobile device or single console. Advanced diagnostic tools ensure fast installations, easy commissioning and quick, efficient pinpointing of network performance and connection issues.

For more information on Johnson Controls’ fire and life safety systems, go to http://www.johnsoncontrols.com/buildings/security-and-fire-safety



July 26, 2018


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.