Sinks and Restroom Hygiene


Sloan has introduced three new models to its SloanStone line of molded, solid-surface sinks. 

The new sink models enhance the popular product line with their wide range of aesthetic and color options designed to fit the needs of schools, healthcare facilities, office buildings, malls, airports, stadiums and more. Strategically engineered for high-traffic environments, SloanStone sinks are vandal resistant and feature a single-molded basin with non-porous surfaces for a hygienic environment that can be easily serviced. 

“SloanStone sinks have been providing users with a sleek and hygienic hand-washing option that has elevated the commercial restroom experience over the last 10 years,” said Sloan product manager, sinks, Morgan Butts. “Sloan is proud to unveil its trio of new models that provide commercial restrooms with an even wider range of beautiful molded sink options at a competitive price.” 

Each of Sloan’s new sinks are ideal for wall-mount applications and are designed to pair perfectly with Sloan faucets and soap dispensers. Sloan’s expanded product line has 14 SloanStone sinks, including: 

  • Round Front ELRF Series: With limited corners, this design is well-suited for restrooms frequented by children.
  • Arrowhead ELA Series: A unique design, the Arrowhead features a modern aesthetic, with a slight point and an open front edge.
  • Waterfall ELWF Series: This model is tailored for mixed adult and children locations. Its ADA-friendly design provides one or more adult-height stations paired with one child-height station.


The new SloanStone models complement its existing line of sinks such as the gradient (ELGR series) and electronic lavatory system (ELS Series) models and are elevated even further with the ability to be paired with any of Sloan’s faucets and seven new matching sensor-activated soap dispensers for a cohesive on-deck aesthetic.



June 6, 2018


Topic Area: Press Release


Recent Posts

IAQ and Infection Mitigation: Plans Into Actions

To support quality patient care and ensure compliance, managers must stay ahead of environmental and IAQ risks.


Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Dayton Children's Hospital Announces New Rehabilitative Services Building

The new location will feature convenient surface parking, outdoor space to aid in healing and a single-level layout.


The Debate on Laundering Microfibers in Healthcare

Should microfibers be single-use or reusable? Researchers have opinions on both.


Construction Begins for New Cancer Center at OhioHealth's Administrative Campus

The project’s completion date is estimated for late 2028.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.