While Nigeria only generates about 4,000 MW on most days even though it has an installed capacity of 12,522 MW, a hospital in Lagos Island keeps the lights on with solar power, according to an article on the TechCabal website.
The installation of the system was completed in two hours by two solar installers.
Before switching to solar, generator noise disturbed the hospital’s patients. Power outages also meant that patients had to stay without electricity.
Although the hospital has not completely gone off-grid, power from the grid is now back-up.
A 'Superbug' Is on the Rise in Hospitals
The Next Generation of Security Tech in Healthcare Facilities
Encompass Health Rehabilitation Hospital of St. Petersburg Opens
Why More Facilities are Adding Gender Neutral Restrooms
Massachusetts Hospital Cyberattack Reflects Growing Vulnerability in Healthcare Systems