Focus: Infection Control

Spanish hospital wins battle with two superbugs

From July to October 2015, the infection control team identified a surge in cases of patients infected or colonized with OXA-48-PE or MRAB.


From July to October 2015, the infection control team at the of La Paz University Hospital in Spain identified a surge in cases of patients infected or colonized with OXA-48-PE or MRAB, according to an article on the Contagion Live website.

The hospital infection control team implemented several advanced measures to stop the spread. The ICU received a deep clean using 500-ppm chlorine solution and reinforcement of hand hygiene and contact precautions for all patients. 

Affected patients were isolated in a specific area of the ICU and cared for by designed staff. Vaporized hydrogen peroxide (VHP) was used to decontaminate the area after cleaning with the chlorine solution. 

The infection control team also utilized 4% chlorhexidine soap for daily hygiene. The control efforts were successful and further transmission of the organisms was halted. 

Read the article.

 

 



January 4, 2018


Topic Area: Infection Control


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.