Swinerton Completes Construction at Atlanta's Grady Hospital

Projects mark Swinerton’s first partnership with Georgia’s largest hospital.

By HFT Staff


Swinerton Builders announced the completion of two construction projects for Grady Hospital, home to one of the largest trauma centers in the nation. With a combined budget of nearly $1 million, the construction scope encompassed the build-out of a new genetics lab as well as renovation of administration office areas at the medical institution. 

A design-build renovation on the first floor of the institution adapted an existing office environment to better align with current workplace needs. The construction scope converted two shared administration areas into two executive offices and an updated, shared administrative space. This compact but complex project demolished the existing built-in office equipment and erected a wall, creating two separate spaces. Designed by CDH Partners, the new office environments feature upgraded flooring, ceiling, furniture and finishes. Swinerton also relocated the fire sprinklers, installed new low-voltage wiring, upgraded electrical services and balanced and redistributed the existing HVAC system. The drywall and acoustical ceiling tiles were installed by Swinerton’s self-perform team. 

Located on the fourth floor of Grady Hospital’s F wing, Swinerton also completed the design-build of a short-term genetics laboratory. An existing office was converted into the laboratory which is needed to support the hospital’s DNA research while its permanent genetics research facility is under construction. Once the facility is complete, the short-term lab will be added to the hospital’s overall inventory for ongoing testing and research. Swinerton also partnered with architecture firm CDH Partners and design engineers IMEG for this scope of work. 

The design-build approach offered a unique opportunity to streamline both design and construction, accelerating the delivery of these much-needed spaces to Grady. Grady drove the overall vision while Swinerton and the design team oversaw the design and constructability, generating efficiencies through close collaboration. As an increasingly popular delivery method, design-build can be more cost-effective as it removes the necessity for managing a separate design phase contract and instead only requires pre-planning and execution phases. Preparation for mobilization can also occur concurrently with the design phase, allowing all project partners to remain fully informed of all processes and maintain the desired schedule. 

Grady Hospital’s administration offices and short-term lab are two of the latest healthcare projects that Swinerton has recently delivered throughout the Southeast. Most recently, Swinerton completed two new locations – with another currently under construction – for Seattle-based Vera Whole Health as part of the healthcare provider’s eastward expansion. Last year, Swinerton also completed a $1 million upgrade at UNC Health Blue Ridge Hospital in Valdese, NC., which included establishing a mobile technology dock for the hospital’s fleet of Mobile Integrated Health vehicles. 



December 16, 2025


Topic Area: Construction


Recent Posts

Making Multi-Site Lighting Upgrades Work

Success requires a program structure that connects audits, financial analysis, rebate administration, procurement, scheduling and closeout documentation.


Designing a Positive Care Destination for Children

The new Mary Bridge Children’s Hospital reimagines the healthcare experience to create an environment that feels welcoming from arrival to discharge.


Blackbird Health Opens 10th Clinic in Pennsylvania

The Bala Cynwyd clinic represents Blackbird Health's 13th location overall.


Healthcare Construction Infection Control: Essential CDC Guidelines for Active Facilities

Construction and renovations happen, but that doesn’t mean infection prevention can take a backseat. The CDC has some recommendations for maintaining best practices during construction.


Protecting the Most Vulnerable: Inside the NICU

SSM Health St. Mary’s Hospital leaders share how maintaining power, air quality and essential systems helps protect patients during their most vulnerable moments.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.