York Dedicated Outdoor Air System from Johnson Controls meets fresh air requirements


Johnson Controls rounds out its line of HVAC products with a new Dedicated Outdoor Air System (DOAS). The York DOAS meets ASHRAE 62.1 fresh air requirements, delivering up to 100 percent clean, dehumidified outside air in all weather and climate conditions. The system also meets customer comfort requirements with precise control through modulating heating and cooling capacities.

The York DOAS is fully configurable, with more factory-installed options than any other unit, making it easy to install and use. Its robust construction, including foam panel double-wall construction, R13 insulation value, renewable/organic insulation material, safe bottom lifting, pre-painted G90 galvanized steel and hinged and lockable doors, allows for reliable performance and longevity.

A direct drive plenum fan is at the heart of the York DOAS, and an energy recovery module pre-conditions fresh air by using energy from the exhaust air. The system also features:

Stainless steel heat exchangers

MERV 8 and MERV 13 filters

Independent modulating reheat circuit

Variable frequency drive supply fan control

ECM condenser fans

Additionally, the DOAS advanced control system is intuitive, user friendly and designed to be integrated with building automation systems.

For more information, visit www.johnsoncontrols.com/be.



November 19, 2015


Topic Area: Press Release


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.