Focus: Infection Control

Faulty sink valve causes flood at Canadian healthcare facility

Leak happened in unit where patients recover from bone marrow procedures


A small flood has forced the evacuation of part of the Centennial Building at the Victoria General Hospital in south-end Halifax, according to an article on the CBC website.

A faulty valve on a sink in a patient's room on the eighth floor was being repaired by maintenance workers when the leak occurred, which resulted in about two centimetres of water on the floor.

The leak happened in unit where patients recover from bone marrow procedures.

Once that cleanup is complete, infection control will go in and verify that it's safe for patients to return.

Read the article.

 



September 6, 2017


Topic Area: Maintenance and Operations


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.