A small flood has forced the evacuation of part of the Centennial Building at the Victoria General Hospital in south-end Halifax, according to an article on the CBC website.
A faulty valve on a sink in a patient's room on the eighth floor was being repaired by maintenance workers when the leak occurred, which resulted in about two centimetres of water on the floor.
The leak happened in unit where patients recover from bone marrow procedures.
Once that cleanup is complete, infection control will go in and verify that it's safe for patients to return.
Preparing Healthcare Facilities for Severe Thunderstorms
University of South Carolina Opens New Brain Health Center
NLCS Strengthens Safety and Compliance with Comprehensive Electrical Program
Infrastructure Issues: Assisting Mobility-Challenged Visitors
Willis-Knighton Medical Center Upgrades Chilled Water Plant