Focus: Facility Design

Hennepin County Medical Center’s new ambulatory clinic building reaching for LEED Silver

The building will include six floors of clinics and services, two levels of underground pay parking with 221 stalls for patients and family


Hennepin County Medical Center’s new ambulatory clinic building marks the biggest expansion in history for Minneapolis/Saint Paul’s largest teaching hospital.

The $220.8 million, 377,000-square-foot facility will consolidate more than 40 primary and specialty clinics currently spread across nine buildings. It will also be built and operated with the goal of achieving LEED Silver certification, according to a presentation by Dylan McCormick, Project Manager, Walker & Associates, Inc., at the 2017 Critical Facilities Summit, held in October in Minneapolis.

“Our goal is to achieve LEED Silver and in doing so minimize the impact of the ecosystem by revitalizing the downtown site. And through building efficiency and energy savings and a healthy interior space,” McCormick said.

The building will include six floors of clinics and services, two levels of underground pay parking with 221 stalls for patients and family. Primary, specialty care and physical and occupational therapy, as well as a same day surgery center with five operating rooms, and four GI/endoscopy rooms, will be housed in the new facility. The clinic will also be home to a Cancer Center with Radiation Therapy, Outpatient Imaging Center, Women’s Imaging, and skyway and tunnel connections to the rest of the HCMC campus.

The new ambulatory healthcare facility, which is expected to see it’s first patient in March, has the following sustainability goals:

• Achieve LEED Silver Certification (50-59 points of a potential 110)

• Further connection to existing HCMC campus, downtown Minneapolis, and the Elliot Park Neighborhood

• Use low-emitting materials and provide a healthy indoor environment

• Improve site conditions

–       Brownfield redevelopment

–       – Storm water management

–       – Reducing heat island effects

LEED Silver’s main credit categories include:

• Sustainable sites credits encourage strategies that minimize the impact on ecosystems and water resources

•Water efficiency credits promote smarter use of water, inside and out, tor educe potable water consumption

•Energy and atmosphere credits promote better building energy performance through innovative strategies

•Materials and resources credits encourage using sustainable building materials and reducing waste

•Indoor environmental quality credits promote better indoor air quality and access to daylight and views

For instance, the water efficiency portion of the new ambulatory clinic’s plan will be accomplished in part with a 20% reduction in water use and water-efficient landscaping.



November 22, 2017


Topic Area: Project News for Healthcare Facilities


Recent Posts

The OR HVAC Puzzle: Why Individual Systems Are on the Rise

Extra penetrations, tight clearances and strict humidity needs—design experts explain what it really takes to plan dedicated units for each operating room.


Sutter Health Announces Plans for New Santa Clara Medical Center

Sutter projects the medical center will open in late 2031.


Sanford Health Receives $300M Gift for Black Hills Medical Center Campus

Construction is scheduled to begin in 2027 with completion expected by 2030.


Wanted: Scientific Standard for Hospital Cleaning

No accepted criteria exist for defining a surface as clean using microbiologic methods.


NLCS Strengthens Safety and Compliance with Comprehensive Electrical Program

Case study: A renewed partnership with Siemens helps the senior living provider meet NFPA 70B standards, reduce risk, and enhance reliability across its communities.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.