Focus: Patient Satisfaction/Experience
Atlanta hospital brightens parking garage with mural
A 2,000-square-foot mural was added to cover a 100-foot-wide cement column in the center of a patient vehicle drop-off circle at Northside Hospital
As part of an expansion project, a 2,000-square-foot mural was added to cover a 100-foot-wide cement column in the center of a patient vehicle drop-off circle at Northside Hospital in Atlanta, according to an article on the Healthcare Design website.
Read the article.
December 17, 2019
Topic Area:
Maintenance and Operations
Recent Posts
When someone faces a serious medical condition, having access to world-class care close to home can make all the difference.
Case study: How APM Steam helped Atrium Health Cabarrus uncover hidden steam system inefficiencies and build an actionable repair plan with a projected $144,949 in annual energy savings.
This year totaled more than 6,000 facilities nationwide.
300 kW solar system and roof upgrade delivered with no upfront cost for medical center association.
Case study: A proactive steam trap maintenance program is delivering millions in savings, fast payback and measurable carbon reductions across one of the nation’s largest health systems.