Benefits of maintenance planning and scheduling

It can be difficult to justify a full-time MPS position, but you should be able to justify the function


Of all of the major components of a well-managed maintenance department — including organization, staffing, work order systems, spare parts and supplies, training, performance measures, quality control, and preventive and predictive maintenance — the maintenance planning and scheduling (MPS) process is missing more often than all of the other components, according to an article from Facility Maintenance Decisions magazine on the FacilitiesNet website.

The likely results of not having MPS are chaos, high costs, low quality, and low morale. Without MPS, you’ll always have a reactive organization, and the costs to maintain equipment will be four to six times higher than they should be. the article said.

In small organizations, it can be difficult to justify a full-time MPS position, but you should be able to justify the function. Assign the MPS task to a technician so one day each week, that person spends time scheduling work for the upcoming week. 

One alternative method to justify a full-time planner, especially in organizations with 15 or more technicians, involves wrench time — the amount of time technicians spend inspecting, troubleshooting and fixing. The U.S. average for wrench time is 25-30 percent of total available time. Optimal wrench time is closer to 40 percent. MPS is the biggest difference between the two.

Read the article.

 

 



January 29, 2018


Topic Area: Maintenance and Operations


Recent Posts

High-Performance Windows Support Safety at UW Medicine's New Behavioral Health Center

Case study: Engineered for strength, quiet and daylight, the chosen windows help create a safe, calming and energy-efficient environment for patients and providers.


Central Maine Healthcare Dealing with IT System Outage

The organization identified unusual activity within their computer software, prompting them to secure and shut off all IT systems.


Kaiser Permanente Opens Newly Expanded Everett Medical Center

The facility offers primary care and pediatric care and has specialty care departments.


Scripps Memorial Hospital La Jolla Opens North Tower

The 420,000-square-foot structure of glass, brick and steel took eight years to plan and construct.


Prefabrication Opens Doors to Smarter Construction

UPMC Presbyterian is able to build 40 percent of its new bed tower offsite.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.