Benefits of maintenance planning and scheduling

It can be difficult to justify a full-time MPS position, but you should be able to justify the function


Of all of the major components of a well-managed maintenance department — including organization, staffing, work order systems, spare parts and supplies, training, performance measures, quality control, and preventive and predictive maintenance — the maintenance planning and scheduling (MPS) process is missing more often than all of the other components, according to an article from Facility Maintenance Decisions magazine on the FacilitiesNet website.

The likely results of not having MPS are chaos, high costs, low quality, and low morale. Without MPS, you’ll always have a reactive organization, and the costs to maintain equipment will be four to six times higher than they should be. the article said.

In small organizations, it can be difficult to justify a full-time MPS position, but you should be able to justify the function. Assign the MPS task to a technician so one day each week, that person spends time scheduling work for the upcoming week. 

One alternative method to justify a full-time planner, especially in organizations with 15 or more technicians, involves wrench time — the amount of time technicians spend inspecting, troubleshooting and fixing. The U.S. average for wrench time is 25-30 percent of total available time. Optimal wrench time is closer to 40 percent. MPS is the biggest difference between the two.

Read the article.

 

 



January 29, 2018


Topic Area: Maintenance and Operations


Recent Posts

From Downtime to Data: Rethinking Restroom Reliability in Healthcare

Manufacturers discuss the operational issues plaguing healthcare restrooms and how to shift maintenance from reactive to resilient.


LeChase Building Four-Story Addition to UHS Delaware Valley Hospital

It will consolidate services into a state-of-the-art Medical Neighborhood.


AdventHealth Sebring Breaks Ground on Expansion Project

Construction is scheduled to begin in March and is anticipated to be completed in Fall 2027.


Regulations Take the Lead in Healthcare Restroom Design

Infection-control guidance and water management standards drive earlier planning, smarter fixtures and more resilient restroom environments.


AHN Allegheny Valley Hospital Opens Expanded Inpatient Rehabilitation Unit

Construction began in July 2025 and included 12 new inpatient rehabilitation beds, bringing the unit’s total to 29.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.