Spaulding Rehabilitation Hospital Boston
spauldingrehab.org

Boston rehab hospital designed to be as inclusive, sustainable and accessible

Architectural details reflect waterfront location as play a role in patients' healing process

By Healthcare Facilities Today


In an amazing example of fortuitous timing, Boston's Spaulding Rehabilitation Hospital opened less than two weeks after the Boston Marathon bombings. Located on Boston Harbor in the city's historic Charlestown Navy Yard, was built to welcome patients and community members alike, use resources wisely and accommodate people of all physical abilities, according to the cover story in the September issue of Health Facilities Management magazine. 

"We were interested in having the whole environment be one that was as healing as could be for people going through a rehab process," said hospital president David Storto in the article.

The waterfront influenced much of the hospital's design. The facility's gray exterior is evocative of ship-building material. This design not only responds to its surroundings, it allowed for the use of more exterior glass, opening up the building in a way that would not have been possible with traditional brick, according to architect Ralph Johnson of Perkins+Will.

Outdoor therapy spaces including a waterfront garden with ramps and a large terrace off the third-floor gym tie the facility to its environment and the hospital's rehabilitative mission. According to the article, even the exterior paving system has a role in patients therapy. 

The light gray surface is intersected at regular intervals by dark granite bands, to enable patients to measure how far they have progressed around the site and to encourage them to go farther. "Architecture as part of the healing process is really the big idea," said Johnson.

Read the story and sidebars.

Take a photo tour of the hospital.

 

 



September 11, 2013


Topic Area: Architecture


Recent Posts

Healthcare Security: To Arm Or Not To Arm?

Deciding whether or not to hire armed security personnel requires that managers understand a range of critical considerations.


False Alarm at Kansas Hospital Highlights Importance of Alarm System Reliability

After a two-hour search of the hospital and nearby medical facilities, no threat was found.


Integrated Oncology Network Caught Up in Data Breach

The network first learned of the incident on April 11, 2025.


ISSA Introduces Healthcare Platform to Advance Safer, Cleaner Patient Environments

This new resource integrates training, research and cross-sector collaboration to raise care standards and improve patient outcomes.


Third-Party Tracking Settlement is a Compliance Wake-Up Call for Healthcare Facilities Managers

Mount Sinai Health System agrees to a $5.3 million settlement to resolve claims it improperly shared patient data with Facebook through tracking tools.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.