Duro-Last, Inc. adds flute fill combo board to their Duro-Guard insulation product line


SAGINAW, MICHIGAN – Duro-Last, Inc. announces an addition to its Duro-Guard insulation product line with EPS Flute Fill Combo Board for another Time off the Roof™ solution.

Duro-Guard EPS Flute Fill Combo Boards combine flute fill with the 4’x8’ flat panels. The custom formed EPS board is available with a factory laminated fire rated coated-glass fiber mat or a polyester facer over the EPS insulation. The one-step insulation installation will speed up installations and reduce labor on metal building retro-fit applications. Duro-Guard EPS Flute Fill Combo Board may be used directly under Duro-Last, Duro-Tuff® or Duro-Fleece® membranes without the use of a separator sheet.

Duro-Guard EPS Flute Fill Combo Boards are specifically designed for metal building retro-fit applications that employ mechanically attached or Duro-Bond® induction welding systems. The advantages of using the EPS Flute Fill Combo Board is the reduced labor from single-piece construction combined with a laminated facer which eliminates the need of a separator sheet. Other benefits include: code approvals, stable R-values, moisture resistance, and environmentally friendliness. The EPS Flute Fill Combo Board has no formaldehyde or ozone-depleting CFC’s or HCFC’s. It also contains 25% recycled material and is 100% recyclable.  

Duro-Last is known for prefabricated roofs, custom curbs and stacks, renowned quality assurance and technical field services, as well as industry-leading warranties. The addition of the EPS Flute Fill Combo Board provides Duro-Last customers with another Time off the Roof solution, one of several new options to save you time and money.

About Duro-Last®, Inc. 

Known as the “World’s Best Roof®”, Duro-Last®, Inc. is the world's largest manufacturer of custom prefabricated, thermoplastic single-ply roofing systems.  Factory controlled custom prefabrication eliminates up to 85% of field seams, resulting in lower on-site labor costs and easier installation. This highly sustainable and extremely durable roofing system is leak-proof, virtually maintenance-free and resistant to chemicals, fire, punctures, and high winds. Over two billion square feet of Duro-Last membrane has been installed throughout North America. Duro-Last is headquartered in Saginaw, Michigan with additional manufacturing facilities in Grants Pass, Oregon; Jackson, Mississippi; Sigourney, Iowa, and Carrollton, Texas. For more information on Duro-Last, call 800-248-0280 or visit www.duro-last.com.

 

 

 

 



April 15, 2014


Topic Area: Press Release


Recent Posts

Respecting EVS Workers: 19 Minutes Is Not Enough

The infection control problem is time, and it's up to facility managers, EVS directors and infection preventionists to address the problem.


Where are the Greenhouse Gas Emissions Hotspots in Healthcare?

First-year findings from Boston Medical Center show medical waste generates a disproportionate amount of healthcare emissions.


Caravel Autism Health Opens Clinic in Lake Zurich, Illinois

The clinic features colorful, sensory-friendly spaces where children work one-on-one with therapists.


The Future of Healthcare Facility Construction Projects

Brian Cowperthwaite highlights the invisible work that impacts everyone who walks through a healthcare facility.


Ground Broken on Jupiter Medical Center's Second Hospital

The 53,000-square-foot hospital will include 29 inpatient beds, four operating rooms, 24-hour emergency services, a diagnostic laboratory and imaging services.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.