Fire door smoke detectors Q&A

In a recent Q&A on the FacilityCare website, consultant Brad Keyes answered a question about fire door smoke detectors


In a recent Q&A on the FacilityCare website, consultant Brad Keyes answered a question about fire door smoke detectors. 

Q: The life safety consultant doing our annual inspection keeps saying that I need to have individual smoke detectors for my corridor fire-rated doors. The corridors on both sides of these doors are completely protected with smoke detectors, but he says, regardless, that area smoke detectors are required next to the doors. Is this correct? 

A: No, I don’t believe what the consultant is telling you is correct. Section 2-10.6 of NFPA 72 (1999) allows for either area smoke detectors or complete-corridor smoke detector protection to activate the release of a hold-open on a door serving as a fire barrier or a smoke compartment barrier. So, with regard to the cross-corridor doors that are held open by magnets connected to the fire alarm system, you are permitted to have one of several things, including a smoke detector on either side of the door, mounted within five feet of the door.

Read the full answer. 

 

 

 



February 12, 2015


Topic Area: Safety


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.