Greenheck expands laboratory and fume exhaust fan line with two new models


Greenheck’s Vektor® line of high plume laboratory and fume exhaust systems has expanded with the addition of two new models. The Vektor®-CH utilizes an engineered high velocity discharge nozzle that efficiently exhausts air high above the roof. In combination with a centrifugal blower, the Vektor-CH achieves high pressures and flow rates commonly required by fume exhaust systems. With multiple discharge nozzles available per size, Vektor-CH can be specified for project-specific requirements, reducing first costs and operating costs. The Vektor®-CS employs a variable geometry nozzle that maintains a constant discharge velocity, while constant duct static pressure is maintained by adjusting the fan speed with a variable frequency drive. As airflow through the fan varies, the nozzle discharge area automatically adjusts to maintain a constant and safe discharge velocity (minimum 3,000 ft./min. per ANSI Z9.5).

Vektor–CS is available in four model sizes 33-44 with performance capabilities of 10,000 to 38,500 cfm and up to 14 in. wg. Vektor-CH has performance capabilities of 10,000 to 60,000 cfm and up to 14 in. wg.  Both have an efficient centrifugal airfoil wheel and air handling quantity bearings, can withstand a 125 mph wind load without guy wires, and comply with ANSI and NFPA standards for laboratory exhaust applications.

Greenheck, the worldwide leader in manufacturing and distributing air movement and control equipment, offers the industry’s widest selection of lab exhaust systems to meet any application requirement.  For more information about Greenheck products, visit www.greenheck.com or contact Greenheck, P.O. Box 410, Schofield, WI 54476-0410, (715) 359-6171, FAX (715) 355-2399.

 



October 10, 2014


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


What To Know Now About OSHA's Updated Hazcom Rule

The update requires careful attention because compliance is not optional, and OSHA has set firm deadlines extending through 2028.


Skills Gap Remains Wide in Facilities Management

Many candidates lack the skills that are needed to be a facilities manager.


Making Healthcare Lighting Retrofits Work

Effective operational planning determines whether a retrofit project improves a facility or creates new problems.


Harris Health to Build New Freestanding Cancer Center

The center is planned to open in 2029, following the opening of the new O'Quinn Hospital along the North Loop at Lockwood.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.