HVAC Designed for Versatility and Energy Efficiency


With the smallest footprint in the industry, Daikin’s new OptiLine is the ideal solution when livable space is at a premium.

Engineered for high-rise apartments, office buildings, dormitories, and hotels, OptiLine provides new levels of quiet, comfortable, and economical heating and cooling in a very slender package. Daikin engineers designed OptiLine to efficiently condition air from 300 to 1200 cfm, optimally matching a building’s space restrictions and efficiency needs.

OptiLine leverages top efficiency to meet building owners’ environmental requirements and budget demands. Using the lowest amount of energy possible, OptiLine can reduce energy costs by 30 to 50 percent compared to similar products currently on the market.

Indoor air quality is a top concern and Daikin takes occupant comfort to the next level with OptiLine. With its variable speed motorized impeller the fan is able to run at the lowest possible RPM, typically reaching less than 60 percent capacity. This unmatched fan efficiency allows OptiLine to achieve noise criterion (NC) of less than 30 for the space, and to control humidity levels to create the most comfortable space for occupants.



January 7, 2019


Topic Area: Press Release


Recent Posts

Healthcare and Resilience: A Pledge for Change

Climate resilience and reducing environmental impact drive voluntary program targeting hospitals.


Texas Health Resources Announces New Hospital for North McKinney

Expected to open in 2028, the hospital will feature 60 beds initially with plans to double in capacity to accommodate for future community growth.


Cedar Point Health Falls Victim to Data Breach

Cedar Point Health has no evidence directly linking this incident to specific incidents of financial fraud or identity theft.


Fire Protection in Healthcare: Why Active and Passive Systems Must Work as One

Sprinklers, smoke compartments and firestopping can form an interdependent safety strategy.


Cleveland Clinic Hits Key Milestones for Palm Beach County Expansion

These include plans to begin demolition of current structure and hospital site preparation in 2026 and open the outpatient center and ambulatory surgery center in 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.