Hackensack University Medical Center Opens the Helena Theurer Pavilion

The Pavilion is a nine-story surgical and intensive care tower.

By HFT Staff


Hackensack University Medical Center opened its 530,000-square-foot Helena Theurer Pavilion. The nine-story surgical and intensive care tower was designed in collaboration with RSC Architects and Page.  

The Pavilion includes: 

  • An intraoperative MRI system, used during neurosurgical and neuro-interventional procedures to help neurosurgeons accurately remove tumors and treat conditions such as Parkinson’s disease, epilepsy, and more 
  • 24 operating rooms; six specially designed to accommodate robotic-assisted surgery systems, allowing nationally and internationally recognized surgeons to perform minimally invasive procedures that may reduce recovery time and improve outcomes 
  • 72 post-anesthesia care unit beds and 50 Intensive Care Unit (ICU) beds 
  • 175 medical/surgical beds, including a Musculoskeletal Institute and intermediate care rooms 
  • 12 negative-pressure rooms to reduce the risk of aerosolized disease transmission within the hospital environment. The entire Pavilion can also be converted to a negative-pressure facility in the event of a future pandemic or public health emergency. 
  • Six da Vinci robotic surgical systems, including one single port system and four orthopedic robots for joint replacement procedures 

All-private patient rooms 

In addition to incorporating features that focus on patient comfort, the facility promotes patient safety and team member efficiency. This includes dedicated CT imaging on the ICU floor, a monitor tablet outside each patient room that provides information for team members, in-room team workstations and patient lift systems. 



February 23, 2023


Topic Area: Construction


Recent Posts

IAQ and Infection Mitigation: Plans Into Actions

To support quality patient care and ensure compliance, managers must stay ahead of environmental and IAQ risks.


Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Dayton Children's Hospital Announces New Rehabilitative Services Building

The new location will feature convenient surface parking, outdoor space to aid in healing and a single-level layout.


The Debate on Laundering Microfibers in Healthcare

Should microfibers be single-use or reusable? Researchers have opinions on both.


Construction Begins for New Cancer Center at OhioHealth's Administrative Campus

The project’s completion date is estimated for late 2028.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.