Rehab center at Illinois hospital upgrades mechanical, electrical and plumbing systems

Transitional care unit remains fully operational during MacNeal Hospital construction


A transitional care unit remains fully operational during the MacNeal Hospital rehab project, according to an article on the Medical Construction & Design website. The Berwyn, Ill., hospital upgraded its interiors and mechanical, electrical and plumbing systems.

The 11,250-square-foot remodel of the Acute Care Rehabilitation Center involved an interior demolition and complete rebuild.

The new suite offers 13 patient rooms, two nurse’s stations, an employee break room and a room for secure storage of medications. The suite also features a fully equipped rehabilitation gym and a model apartment where patients can practice living independently.

Read the article

 

 



November 11, 2015


Topic Area: Product News


Recent Posts

What Managers Miss in Small and Mid-Sized Cooling Units

The assumption is that small cooling units are fine. That assumption is costing facilities more than most owners and managers realize.


Preparing Healthcare Facilities for Cockroach Risks

Here’s what healthcare facilities managers should inspect and address after severe weather to prevent pest problems.


The Medical College of Wisconsin Breaks Ground on Student Housing Complex

The four-story apartment complex will include 266 units of various sizes.


A Shift in Healthcare Facilities Management

Healthcare facilities leaders who embrace a mindset change will be better prepared for the future.


Trauma-Informed Design Transforms Boston Homeless Shelter

Case study: A comprehensive renovation of St. Francis House makes use of trauma-informed design, infrastructure upgrades and operational improvements.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.