Sherwin-Williams introduces KEM Aqua 3001 for heat-sensitive substrates


Sherwin-Williams, through its Product Finishes Division, introduces KEM Aqua® 3001, a waterborne acrylic topcoat for application on vinyl windows, trim, shutters and doors. 

“When gloss and color retention are important in a heat-sensitive substrate, KEM Aqua 3001 provides an excellent solution,” said David Calabra, Director of Marketing. “This coating is designed to meet AAMA 613 performance requirements for organic coatings on plastic profiles.” 

Available in satin and semi-gloss sheens, KEM Aqua 3001 can be used on heat-sensitive vinyl building products such as windows, shutters, doors, and trim in multifamily and residential new construction projects as well as the remodel/replacement windows segment. It utilizes a proprietary solar reflective technology to reduce heat buildup (HBU) across a wide range of colors. 

HBU can result in deformation, warping, or “oil canning,” and in general, darker shades are at greater risk to experience HBU. Said Calabra, “We know that more homeowners are expressing personal style with darker colors in windows. Our solar reflective coating allows OEMs to expand their palette to meet this demand without sacrificing performance.”

The fast-drying coating can be applied direct to the substrate with one coat, or two for added performance. 

For more information about the Product Finishes Division of Sherwin-Williams, visit oem.sherwin-williams.com/kemaqua3001.

 



April 8, 2016


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.