Staco Energy Products announces new product: Unistar Scli924


DAYTON, OH – Staco Energy Products, one of the longest lasting innovators of Power Quality and Voltage Control technologies in the world, announced today that they’ve released a new Single Phase, On-Line Double Conversion Emergency Lighting Inverter called the UniStar SCLI924. 

 “The UniStar SCLI 924 provides the simplicity and reliability that is critical when providing an alternative source of power to any environment,” says Jim Jones, Director - Western Region Sales and UPS Products, of Staco Energy Products. “The UniStar SCLI924 maintains efficient AC Emergency Power to operate all emergency lighting fixtures at “full-light” output, providing superior dependability and security to commercial/industrial environments in a small footprint.”

General Highlights on the UniStar SCLI 924:

· 350W-21kW single phase output unit uses the latest PWM technology to provide the most advanced performance and reliability features

· UL 924, meets NFPA 101, NFPA 70, NEC and OSHA standards

· Emergency power provides FULL LIGHT OUTPUT from all lamps and fixtures for the entire runtime

· Made in the USA

Staco Energy Products Company manufactures voltage control, VAR compensation, uninterruptible power supplies and engineered power quality solutions.   For more than 75 years, customers worldwide have relied on Staco as their dependable source for standard and tailored solutions to a wide range of electrical power problems.  Headquartered in Miamisburg, Ohio, Staco Energy Products is a wholly owned subsidiary of Components Corporation of America, located in Dallas, Texas. 

If you would like more information about this topic, please contact Libby Seder at 937.253.1191 x212 or email at sederl@stacoenergy.com.



February 4, 2015


Topic Area: Press Release


Recent Posts

What Managers Miss in Small and Mid-Sized Cooling Units

The assumption is that small cooling units are fine. That assumption is costing facilities more than most owners and managers realize.


Preparing Healthcare Facilities for Cockroach Risks

Here’s what healthcare facilities managers should inspect and address after severe weather to prevent pest problems.


The Medical College of Wisconsin Breaks Ground on Student Housing Complex

The four-story apartment complex will include 266 units of various sizes.


A Shift in Healthcare Facilities Management

Healthcare facilities leaders who embrace a mindset change will be better prepared for the future.


Trauma-Informed Design Transforms Boston Homeless Shelter

Case study: A comprehensive renovation of St. Francis House makes use of trauma-informed design, infrastructure upgrades and operational improvements.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.