Tubelite meets ICC-ES acceptance criteria for quality documentation (AC10)


Tubelite Inc.’s facilities Walker and Reed City, Michigan, successfully meet ICC Evaluation Services, LLC (ICC-ES) Acceptance Criteria for Quality Documentation (AC10). This third-party inspection by Architectural Testing, Inc. (ATI)/Intertek verifies Tubelite’s quality control process for its products, systems and materials.

“At Tubelite, ‘dependable’ is more than part of our brand identity, it’s part of our everyday culture, our products and our services. Our reputation for dependability is closely connected with our ongoing investment in quality, our continuing improvement initiatives, and our product development and certification efforts,” said Mary Olivier, Tubelite’s director of marketing.

Grace Bartrand, Tubelite’s quality assurance specialist, added, “Being a manufacturer with an AC10-compliant quality system also contributes to achieving Florida Product Approval for our hurricane-resistant, impact-rated storefront, curtainwall, window and entrance systems.”

ICC-ES requires a qualifying inspection of the facilities’ manufacturing products prior to issuing a new evaluation report. According to ICC-ES, “The qualifying inspection is intended to verify that the manufactured products are consistent with the products described in the evaluation report, and that the manufacturer has documented and effectively implemented a quality control system that meets all requirements of the ICC-ES Acceptance Criteria for Quality Documentation (AC10).”

 



June 2, 2015


Topic Area: Press Release


Recent Posts

What Managers Miss in Small and Mid-Sized Cooling Units

The assumption is that small cooling units are fine. That assumption is costing facilities more than most owners and managers realize.


Preparing Healthcare Facilities for Cockroach Risks

Here’s what healthcare facilities managers should inspect and address after severe weather to prevent pest problems.


The Medical College of Wisconsin Breaks Ground on Student Housing Complex

The four-story apartment complex will include 266 units of various sizes.


A Shift in Healthcare Facilities Management

Healthcare facilities leaders who embrace a mindset change will be better prepared for the future.


Trauma-Informed Design Transforms Boston Homeless Shelter

Case study: A comprehensive renovation of St. Francis House makes use of trauma-informed design, infrastructure upgrades and operational improvements.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.