Tubelite meets ICC-ES acceptance criteria for quality documentation (AC10)


Tubelite Inc.’s facilities Walker and Reed City, Michigan, successfully meet ICC Evaluation Services, LLC (ICC-ES) Acceptance Criteria for Quality Documentation (AC10). This third-party inspection by Architectural Testing, Inc. (ATI)/Intertek verifies Tubelite’s quality control process for its products, systems and materials.

“At Tubelite, ‘dependable’ is more than part of our brand identity, it’s part of our everyday culture, our products and our services. Our reputation for dependability is closely connected with our ongoing investment in quality, our continuing improvement initiatives, and our product development and certification efforts,” said Mary Olivier, Tubelite’s director of marketing.

Grace Bartrand, Tubelite’s quality assurance specialist, added, “Being a manufacturer with an AC10-compliant quality system also contributes to achieving Florida Product Approval for our hurricane-resistant, impact-rated storefront, curtainwall, window and entrance systems.”

ICC-ES requires a qualifying inspection of the facilities’ manufacturing products prior to issuing a new evaluation report. According to ICC-ES, “The qualifying inspection is intended to verify that the manufactured products are consistent with the products described in the evaluation report, and that the manufacturer has documented and effectively implemented a quality control system that meets all requirements of the ICC-ES Acceptance Criteria for Quality Documentation (AC10).”

 



June 2, 2015


Topic Area: Press Release


Recent Posts

Making AI Work for Predictive Maintenance

AI can support predictive maintenance by helping managers anticipate equipment failures, reduce downtime and improve operational efficiency.


Thomas Jefferson University Unveils Plans for Sidney Kimmel Medical College in Allentown, PA

Located at One Center Square, in downtown Allentown, the campus will include more than 54,000 square feet of newly constructed medical education space.


Aspirus Chippewa Falls Hospital and Clinic to Open in September

The approximately 35,000-square-foot facility is designed around the needs of patients and families, bringing together hospital, clinic and diagnostic services in one location.


Respecting EVS Workers: 19 Minutes Is Not Enough

The infection control problem is time, and it's up to facility managers, EVS directors and infection preventionists to address the problem.


Where are the Greenhouse Gas Emissions Hotspots in Healthcare?

First-year findings from Boston Medical Center show medical waste generates a disproportionate amount of healthcare emissions.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.