UofL Health – South Hospital Opens in Bullitt County

The new acute care hospital currently houses 40 inpatient beds with shell space for 20 more.

By HFT Staff


UofL Health celebrated the opening of UofL Health – South Hospital, in Bullitt County, Kentucky. The $78-million acute care hospital opened with 40 inpatient beds and shell space for an additional 20 beds. The new hospital fills an access gap in Kentucky’s 10th-most populous county, allowing local patients to get their care closer to home. Bullitt County was previously the largest county in the commonwealth without an inpatient hospital. 

South Hospital is ideally positioned to support one of Kentucky’s fastest growing regions. In addition to inpatient beds, including a 10-bed intensive care unit, the new full-service acute care hospital is bringing more providers. It will also provide enhanced heart care services, including cardiac and vascular catheterization labs and STEMI Network for faster treatment of acute heart attacks, expanded emergency capabilities including a “fast track” area for quicker treatment and discharge, expanded cardiopulmonary services, state-of-the art pharmacy, laboratory and sterile processing areas, and increased surgical suites for inpatient and outpatient procedures. 

As part of an academic health system, the hospital brings additional advantages, including access to a comprehensive collection of medial expertise and early access to innovative treatments. 

The project has evolved the existing medical center, built in 2006, into a hospital, tripling the size of UofL Health’s presence in the area, adding more than 100,000 square feet and an additional two floors. In addition to inpatient services, the new hospital also now includes all the support amenities such as food service, a cafeteria and chapel. 

To support the expanded care, more than 150 new employees have joined the team, including nursing and ancillary positions. 



March 20, 2024


Topic Area: Construction


Recent Posts

Laser Scanning: Reducing Risk in Construction Projects

VDC technology allows teams to define scope based on verified conditions, not on assumptions, reducing change orders and schedule delays.


MOBs Get Smarter and More Complex as Space Pressures Mount

Healthcare facilities teams are turning to data-driven space strategies while adapting to increasingly sophisticated building demands.


Ascension Saint Thomas Sets Date for Groundbreaking on New Hospital and Health Campus

The groundbreaking ceremony will be held on June 16.


Women in Construction Sees Growth on Florida Jobsite

More than 60 women are part of the workforce building a new Orlando Health Hospital.


Managing Soft Surfaces, Clean or Soiled

Soft surfaces present a cross-contamination risk, even if they’re arriving from the laundry. Here are some best practices to handle both soiled and clean linens.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.