Flooding at Atlanta hospital prompts closure of 62 patient beds

Cleanup and repairs have begun in the patient units significantly damaged by flooding


Grady Memorial Hospital in Atlanta, Ga., has closed 62 beds following the break of a pressurized 24-inch diameter water pipe on Dec. 7, according to an article on the On Common Ground website.

Repairs to the pipe have been completed but electrical repairs continue in the affected patient care tower. 

During the repairs, 30 percent of the hospital elevators will remain out of service.

Cleanup and repairs have begun in the patient units significantly damaged by flooding.

Read the article.



December 19, 2019


Topic Area: Maintenance and Operations


Recent Posts

The Future of Healthcare Facility Construction Projects

Brian Cowperthwaite highlights the invisible work that impacts everyone who walks through a healthcare facility.


Arnprior Regional Health Upgrades Building Controls to Improve IEQ

Case study: They wanted to improve the hospital facility’s IEQ to support patient care and reduce long-term operating costs.


Next Level Medical Suffers a Data Breach

To date, NLM has no evidence of identity theft or fraud related to this event.


Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.